Firespec were honoured to be engaged as the Consultants and Inspectors responsible for reactive fire protection systems on this dynamic city centre district, based on the South Bank of the iconic River Clyde.  A massive 40,000m2 of off-site applied intumescent coatings were inspected during application and again after erection and touch-up to ensure compliance with the material manufacturer’s stringent application parameters for environment, preparation and application.  The two buildings now provide the new international-class headquarters for Barclays Bank in Glasgow.