Circle Square, Manchester
Firespec were appointed at an early stage to this £750million project to provide coatings specification consultancy and off-site inspection of surface preparations and priming of structural steel at the fabricator’s manufacturing facility. Once on site, Firespec provided further regular inspection of the application of 55,000m2 of 90 and 120 minute intumescent coatings. When fully complete […]
New Wakefield Street, Manchester
Firespec have been engaged in providing regular fire stopping inspection services throughout the construction of this impressive 32-storey New Wakefield Street development in Manchester city centre. The £37million project consists of more than 17,000m2 of accommodation space across 603 studio and cluster units for Unite Integrated Solutions. The thirty floors of accommodation rise above a […]
First Way Campus, Wembley, London
Firespec were delighted to provide a comprehensive coating, board encasement and passive fire protection inspection service throughout this extensive development. The £100million scheme consisted of 682 student accommodation units, academic facilities and office space for University College of Football, situated just 200m from the National Football Stadium. The primer and intumescent coatings inspections were largely […]
Vita Student Accommodation Leeds
This project consisted of the adoption of a partially constructed structure intended for use as a Hilton Hotel. The redevelopment consisted of 312 student apartments over 16 storeys at a cost £56million on behalf of the Select Property Group, for their Vita Students brand. Firespec provided regular passive fire protection inspection services throughout the construction […]