7&8 Wellington Place, Leeds
Firespec carried out frequent inspections throughout the construction of this £92million phase of the Wellington Place Masterplan in Leeds ranging from on-site verification of off-site applied intumescent coatings to perimeter steels and in-progress examinations of intumescent coatings to internal steels to visual and micro-destructive testing of passive fire protection measures. The 35,000m2 building will now…