This seven storey 15 000m2 HFD Group office development in Glasgow’s business district is occupied by international banking giant Morgan Stanley. The off-site application of
Following the successful delivery of inspection and consultancy services on Bothwell Exchange’s sister project 122 Waterloo Street Firespec were again engaged to perform the off-site
Firespec carried out frequent inspections throughout the construction of this £92million phase of the Wellington Place Masterplan in Leeds ranging from on-site verification of off-site
Firespec were proud to be involved in the delivery of the record-breaking 34 000m2 Amazon distribution facility part of the award-winning Logic Leeds site under
Firespec were delighted to be involved in the new Westfield development “Bradford Broadway” which when completed was the largest UK retail centre to launch in
Firespec were honoured to be engaged as the Consultants and Inspectors responsible for reactive fire protection systems on this dynamic city centre district based on
Firespec were appointed at an early stage to this £750million project to provide coatings specification consultancy and off-site inspection of surface preparations and priming of
Firespec have carried out thorough dry film thickness (dft) testing on a large percentage of this structure which is one half of the £228 Million
Firespec were delighted to provide a comprehensive coating board encasement and passive fire protection inspection service throughout this extensive development. The £100million scheme consisted of
One of a series of new health care centres in the Glasgow City Council areas this multi-million pound health centre (part of the hub West
Firespec were contracted to perform a series of consultations and inspections across the construction phase of this substantial £40million 116 room residential nursing and dementia
The £50 million Inverness College UHI campus project is the largest development in the campus site. This 3 storey building has 20 000m2 space and
Firespec were privileged to deliver a full package of passive and reactive fire protection inspection services to our client on this prestigious Squire & Partners
The £50million Madras College St Andrews due for completion in 2021 is the first part of the £250million Building Fife’s Future Programme due to deliver
Firespec provided passive and reactive fire protection consultancy and inspection services at this prestigious £160million designer outlet village. The extensive site is the seventh
Firespec have been engaged in providing regular fire stopping inspection services throughout the construction of this impressive 32-storey New Wakefield Street development in Manchester city
Located in the heart of Glasgow One West Regent Street is a new landmark development designed by Ryder Architecture with Sir Robert McAlpine as the
Firespec were engaged on a further 15 000m2 Grade A office project in the New bailey development at New Bailey Salford. The scheme is a
Two New Bailey Square is a 17 500m2 BREEAM Excellent state-of-the-art office development occupying a highly prominent gateway position forming part of the New Bailey
Unity Square Phase 1 is part of the £250million Nottingham Southern Gateway scheme. The building offers 62 000m2 of Grade A office accommodation over ten
This project consisted of the adoption of a partially constructed structure intended for use as a Hilton Hotel. The redevelopment consisted of 312 student apartments
This £18 million project to replace the facility in Barr Street was designed by architects Page & Park and constructed by Morgan Sindall. Firespec were
Firespec provided passive fire protection consultancy and inspection services at this new 72 bedroom bespoke Adult and Older Persons Mental Health Facility. The building was